Research on multi-stage optimization planning of power internet of things based on seagull optimization algorithm

Download136 downloads
Cite
BibTeX Plain Text
  • @ARTICLE{10.4108/ew.9093,
        author={Peng Ye and Guanxian Liu and Shuo Yang and Shaotao Guo and Huan Wang and Yi Zhao and Mingli Zhang},
        title={Research on multi-stage optimization planning of power internet of things based on seagull optimization algorithm},
        journal={EAI Endorsed Transactions on Energy Web},
        volume={12},
        number={1},
        publisher={EAI},
        journal_a={EW},
        year={2025},
        month={4},
        keywords={Power internet of things (PIoT), Integrated energy system (IES), Multi-stage, Seagull optimization algorithm (SOA), Planning method},
        doi={10.4108/ew.9093}
    }
    
  • Peng Ye
    Guanxian Liu
    Shuo Yang
    Shaotao Guo
    Huan Wang
    Yi Zhao
    Mingli Zhang
    Year: 2025
    Research on multi-stage optimization planning of power internet of things based on seagull optimization algorithm
    EW
    EAI
    DOI: 10.4108/ew.9093
Peng Ye1,*, Guanxian Liu1, Shuo Yang2, Shaotao Guo1, Huan Wang1, Yi Zhao1, Mingli Zhang3
  • 1: Shenyang Institute of Engineering
  • 2: State Grid Fushun Electric Power Supply CO., LTD, Fushun, China
  • 3: State Grid Liaoning Electric Power CO., LTD, Shenyang, China
*Contact email: yepeng@edu.sie.com

Abstract

The Power Internet of Things (PIoT) is a significant technology for realizing the transformation of future energy systems, with the Integrated Energy System (IES) playing a crucial role in realizing the value of PIoT. Traditional IES planning methods typically focus on a single-stage planning approach and involve complex solution models, often resulting in inefficient equipment configurations and resource wastage. This study proposes a multi-stage IES planning method aimed at enhancing both energy efficiency and the economic performance of IES. The method models the IES based on electric, gas, and thermal buses, considering the coupling, storage, and conversion of multiple energy sources. A range of constraints, such as energy coupling, equipment capacity, and energy purchases, are considered. The planning cycle is divided into multiple stages, and an economic model is developed that accounts for both system investment and operating costs. Given the complexity of the multi-stage planning model, the Seagull Optimization Algorithm (SOA) is introduced to solve the problem. The SOA leverages its strong global and local search capabilities to determine the optimal capacity configuration at each stage. The comparison of the single-stage planning method by a calculation example proves the economic advantage of the multi-stage planning scheme and effectiveness of SOA.

Keywords
Power internet of things (PIoT), Integrated energy system (IES), Multi-stage, Seagull optimization algorithm (SOA), Planning method
Received
2024-08-12
Accepted
2024-09-18
Published
2025-04-15
Publisher
EAI
http://dx.doi.org/10.4108/ew.9093

Copyright © 2025 Peng Ye et al., licensed to EAI. This is an open access article distributed under the terms of the CC BY-NC-SA 4.0, which permits copying, redistributing, remixing, transformation, and building upon the material in any medium so long as the original work is properly cited.

EBSCOProQuestDBLPDOAJPortico
EAI Logo

About EAI

  • Who We Are
  • Leadership
  • Research Areas
  • Partners
  • Media Center

Community

  • Membership
  • Conference
  • Recognition
  • Sponsor Us

Publish with EAI

  • Publishing
  • Journals
  • Proceedings
  • Books
  • EUDL