Research on Design and Cost of Temporary Roads in Mechanized Construction of Transmission Line

Download50 downloads
  • @INPROCEEDINGS{10.4108/eai.15-12-2023.2345308,
        author={Xuemei  Zhu and Ying  Zou and Minquan  Ye and Huiying  Wu and Cong  Zeng and Jiayao  Feng},
        title={Research on Design and Cost of Temporary Roads in Mechanized Construction of Transmission Line},
        proceedings={Proceedings of the 3rd International Conference on Public Management and Big Data Analysis, PMBDA 2023, December 15--17, 2023, Nanjing, China},
        publisher={EAI},
        proceedings_a={PMBDA},
        year={2024},
        month={5},
        keywords={transmission line; temporary road construction; mechanized construction; construction cost},
        doi={10.4108/eai.15-12-2023.2345308}
    }
    
  • Xuemei Zhu
    Ying Zou
    Minquan Ye
    Huiying Wu
    Cong Zeng
    Jiayao Feng
    Year: 2024
    Research on Design and Cost of Temporary Roads in Mechanized Construction of Transmission Line
    PMBDA
    EAI
    DOI: 10.4108/eai.15-12-2023.2345308
Xuemei Zhu1,*, Ying Zou2, Minquan Ye1, Huiying Wu1, Cong Zeng1, Jiayao Feng1
  • 1: State Grid Fujian Economic Research Institute
  • 2: State Grid Fujian Electric Power Co., Ltd.
*Contact email: 8862585@qq.com

Abstract

The full process mechanized construction of overhead transmission lines has been rapidly promoted in recent years. For construction equipment to arrive the site, temporary road should be constucted first. As the prerequisite for mechanized construction of transmission lines, the construction of temporary road has significant impact on engineering construction. At present, there is no systematic method for the construction of temporary roads. This study focuses on the design of temporary roads in construction. Based on the collected main parameters of mechanized construction machinery, the principles and technical requirements for temporary road construction have been determined. Temporary road construction schemes in typical scenarios of plains and mountainous areas are specified. Based on 2018 electricity quota pricing standards, the construction cost of temporary road is estimated, and highlighting cost-saving measures during construction are considered. This research achievement can serve as a reference for the design and pricing of subsequent power grid projects, thereby facilitating the optimization of design schemes and investment control of transmission line engineering.