Study on the Cost of Environmental Protection Measures in Overhead Transmission Lines

Download121 downloads
  • @INPROCEEDINGS{10.4108/eai.9-12-2022.2327704,
        author={Xiaoyan  Yu and Min  Yu and Fuyan  Liu and Xiaoyong  Yang},
        title={Study on the Cost of Environmental Protection Measures in Overhead Transmission Lines},
        proceedings={Proceedings of the 4th Management Science Informatization and Economic Innovation Development Conference, MSIEID 2022, December 9-11, 2022, Chongqing, China},
        publisher={EAI},
        proceedings_a={MSIEID},
        year={2023},
        month={3},
        keywords={overhead transmission line project environmental protection measures fee analysis of influencing factors},
        doi={10.4108/eai.9-12-2022.2327704}
    }
    
  • Xiaoyan Yu
    Min Yu
    Fuyan Liu
    Xiaoyong Yang
    Year: 2023
    Study on the Cost of Environmental Protection Measures in Overhead Transmission Lines
    MSIEID
    EAI
    DOI: 10.4108/eai.9-12-2022.2327704
Xiaoyan Yu1, Min Yu1, Fuyan Liu1, Xiaoyong Yang1,*
  • 1: State Grid Zhejiang Power Co., Ltd.
*Contact email: ngxy20213@163.com

Abstract

With the rapid development of overhead transmission line engineering construction and the increasingly strict environmental supervision policy, the project environmental impact assessment work actively, has become the important content of the early decision-making management of the project construction. Based on the characteristics of overhead transmission line construction and engineering environmental protection measures, the paper systematically analyzes the main factors of environmental protection measures and the scale of environmental protection measures for environmental protection measures, and provides reference and reference.