Proceedings of the 2nd International Conference on Industrial and Technology and Information Design, ICITID 2021, 30 August 2021, Yogyakarta, Indonesia

Research Article

Technical Review of Mine Dewatering System Case Study Underground Gold Mine PT Bumi Suksesindo

Download1769 downloads
  • @INPROCEEDINGS{10.4108/eai.30-8-2021.2311502,
        author={Tedy Agung Cahyadi and Sevian  Anggoro and Singgih  Saptono and Suyono  Suyono and Indah  Setyowati and Sri  Sugarto},
        title={Technical Review of Mine Dewatering System Case Study Underground Gold Mine PT Bumi Suksesindo},
        proceedings={Proceedings of the 2nd International Conference on Industrial and Technology and Information Design, ICITID 2021, 30 August 2021, Yogyakarta, Indonesia},
        publisher={EAI},
        proceedings_a={ICITID},
        year={2021},
        month={10},
        keywords={minerals technical review mine dewatering},
        doi={10.4108/eai.30-8-2021.2311502}
    }
    
  • Tedy Agung Cahyadi
    Sevian Anggoro
    Singgih Saptono
    Suyono Suyono
    Indah Setyowati
    Sri Sugarto
    Year: 2021
    Technical Review of Mine Dewatering System Case Study Underground Gold Mine PT Bumi Suksesindo
    ICITID
    EAI
    DOI: 10.4108/eai.30-8-2021.2311502
Tedy Agung Cahyadi1,*, Sevian Anggoro2, Singgih Saptono3, Suyono Suyono1, Indah Setyowati1, Sri Sugarto1
  • 1: Department of Mining Engineering, Faculty of Mineral Technology, UPN Veteran Yogyakarta
  • 2: Undergraduate Student of Mining Engineering, Faculty of Mineral Technology, UPN Veteran Yogyakarta
  • 3: Mine Plan Engineer, Decline Department, PT. Bumi Suksesindo
*Contact email: sev.angg@gmail.com

Abstract

Minerals which located below the surface of the groundwater require pumping activities to carry out the mining activities. The problem that has occurred so far is that the work front located lower than the portal causes the waters from groundwater seepage and underground mining equipment to be collected and pooled on the work front. This causes the work area to be flooded and causes the mining activities to be delayed up to 5 hours. The study of the mine drainage system is expected to evaluate the existing mine drainage system in the PT Bumi Suksesindo underground mine, including analysis of groundwater seepage, mine water discharge, sump volume, pump requirements and alternative pumping system networks. Based on several trial and error experiments, the groundwater inflow is 1,17 x 10-5 m3s-1 on average at each seepage’s location point. The recommendation to resolve the mine dewatering problems are an addition of a booster pump on sump 2 and sump 1, the dimensions of the sump has to be increased, add an airflow control valve to ensure that the source of air pressure is 3 bar, and a replacement of pump impeller to MT 231 coded impellers.