@INPROCEEDINGS{10.4108/eai.27-10-2023.2341985, author={Guanglei Huang and Tao Wang and Shuyao Chen and Tian Mao and Jiangnan Li}, title={Research on Design Scheme Comparison of Power Grid Infrastructure Project based on Equipment LCC}, proceedings={Proceedings of the 4th International Conference on Economic Management and Big Data Applications, ICEMBDA 2023, October 27--29, 2023, Tianjin, China}, publisher={EAI}, proceedings_a={ICEMBDA}, year={2024}, month={1}, keywords={substation; refinement; life cycle cost}, doi={10.4108/eai.27-10-2023.2341985} }
- Guanglei Huang
Tao Wang
Shuyao Chen
Tian Mao
Jiangnan Li
Year: 2024
Research on Design Scheme Comparison of Power Grid Infrastructure Project based on Equipment LCC
ICEMBDA
EAI
DOI: 10.4108/eai.27-10-2023.2341985
Abstract
With the deepening of power system reform, there is a corresponding evolution in power grid equipment, as an important core management object of the enterprise, faces higher requirements for the refinement of cost accounting and the lean value management, that is, the degree of precise investment needs to be deepened. In this context, this paper examines the cost consumption of substation equipment, encompassing the entire lifespan from construction to retirement, with a focus on the equipment itself. so as to construct various indicators that can accurately and objectively reflect its life cycle cost. Finally, combined with the actual example, 110 kV outdoor aviation road substation and 110 kV indoor Gusaoshu substation are selected for example verification, additionally, the paper compares the disparities in each sub-index of the life cycle cost among various types of substations, and the effectiveness of the method is demonstrated.