Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China

Research Article

Study on the Method of Increasing Rate of Power Grid Substation Production based on Big Data Statistical Analysis

Download166 downloads
  • @INPROCEEDINGS{10.4108/eai.24-2-2023.2330679,
        author={Yun  Huang and Weijie  Zhao and Kai  Wang and Shaoyi  Wang},
        title={Study on the Method of Increasing Rate of Power Grid Substation Production based on Big Data Statistical Analysis},
        proceedings={Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China},
        publisher={EAI},
        proceedings_a={EMIS},
        year={2023},
        month={6},
        keywords={power grid substation production emergency repair project big data statistics construction operation costs rate calculation},
        doi={10.4108/eai.24-2-2023.2330679}
    }
    
  • Yun Huang
    Weijie Zhao
    Kai Wang
    Shaoyi Wang
    Year: 2023
    Study on the Method of Increasing Rate of Power Grid Substation Production based on Big Data Statistical Analysis
    EMIS
    EAI
    DOI: 10.4108/eai.24-2-2023.2330679
Yun Huang1,*, Weijie Zhao2, Kai Wang2, Shaoyi Wang2
  • 1: Yunnan Power Grid Co.ltd
  • 2: Yunnan Power Grid Co.ltd.
*Contact email: huyu20221@163.com

Abstract

As an important part of the safe and stable operation of the power grid production emergency repair project, the investment scale level has been continuously improved. However, the current project budget preparation and calculation provisions used in the pre-preparation (settlement) calculation of emergency repair projects cannot fully meet the actual billing and settlement needs of emergency repair projects. Therefore, it is urgent to deepen the adjustment of cost standards related to production emergency repair projects. In this paper on the system analysis of the power grid production current situation of emergency repair project management, through the collection of GX provincial power grid company emergency repair project cost statistics, based on the research object multiple attribute analysis, summarizes the substation maintenance engineering construction process points, and the comprehensive statistics and comparative analysis, provide basic information, data analysis and business practice comparison test reference.