Practice of Integrated Management and Platform Construction for Group-level Engineering Project Based on GIS+BIM Technology

Download451 downloads
Cite
BibTeX Plain Text
  • @INPROCEEDINGS{10.4108/eai.24-2-2023.2330659,
        author={Xuejian  Wang and Jiayuan  Wang and Yuyu  Zhang and Li-Jie  Zhang and Xiaolin  Zhou},
        title={Practice of Integrated Management and Platform Construction for Group-level Engineering Project Based on GIS+BIM Technology},
        proceedings={Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China},
        publisher={EAI},
        proceedings_a={EMIS},
        year={2023},
        month={6},
        keywords={subway engineering; building information modelling (bim); geographic information system (gis); integrated management; platform construction},
        doi={10.4108/eai.24-2-2023.2330659}
    }
    
  • Xuejian Wang
    Jiayuan Wang
    Yuyu Zhang
    Li-Jie Zhang
    Xiaolin Zhou
    Year: 2023
    Practice of Integrated Management and Platform Construction for Group-level Engineering Project Based on GIS+BIM Technology
    EMIS
    EAI
    DOI: 10.4108/eai.24-2-2023.2330659
Xuejian Wang1,*, Jiayuan Wang2, Yuyu Zhang3, Li-Jie Zhang4, Xiaolin Zhou4
  • 1: Shenzhen University
  • 2: Sino-Australia Joint Research Center in BIM and Smart Construction
  • 3: China Railway Southern Investment Group Co., Ltd
  • 4: Shenzhen Thsware Hi-tech Co., Ltd.
*Contact email: wustwxj@163.com

Abstract

Subway engineering construction is characterized by large scale, cross-temporal and cross-region, etc. In view of the problems of many data sources, poor business collaboration, poor visualization and uneven information management in current projects. From the perspective of integrated management of group-level engineering projects, multi-level project organization and business process management of all-factor data integration, visual management of BIM+GIS data integration have been studied, integrated platform architecture design and development of key technologies have been analyzed based on BIM+GIS technology. An integrated platform independently developed for group-level engineering projects, has realized its engineering application in Shenzhen Metro Line 14. Through implementation of project, the platform meets demand of the group’s decision-making level for digitalization, visualization and information management of metro project construction. The economic benefits of the enterprise are improved, and the overall effect is remarkable.

Keywords
subway engineering; building information modelling (bim); geographic information system (gis); integrated management; platform construction
Published
2023-06-15
Publisher
EAI
http://dx.doi.org/10.4108/eai.24-2-2023.2330659
Copyright © 2023–2025 EAI
EBSCOProQuestDBLPDOAJPortico
EAI Logo

About EAI

  • Who We Are
  • Leadership
  • Research Areas
  • Partners
  • Media Center

Community

  • Membership
  • Conference
  • Recognition
  • Sponsor Us

Publish with EAI

  • Publishing
  • Journals
  • Proceedings
  • Books
  • EUDL