Research on MES-based production process control system for discrete manufacturing enterprises

Download188 downloads
  • @INPROCEEDINGS{10.4108/eai.24-2-2023.2330636,
        author={Yan  Liu and Ziwen  Li},
        title={Research on MES-based production process control system for discrete manufacturing enterprises},
        proceedings={Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China},
        publisher={EAI},
        proceedings_a={EMIS},
        year={2023},
        month={6},
        keywords={manufacturing execution system; discrete workshop; production process control; informationization},
        doi={10.4108/eai.24-2-2023.2330636}
    }
    
  • Yan Liu
    Ziwen Li
    Year: 2023
    Research on MES-based production process control system for discrete manufacturing enterprises
    EMIS
    EAI
    DOI: 10.4108/eai.24-2-2023.2330636
Yan Liu1,*, Ziwen Li1
  • 1: Liaoning Technical University
*Contact email: 932355255@qq.com

Abstract

In order to solve the problems commonly existing in discrete manufacturing enterprises, such as unreasonable placement of production resources, difficult fine management and control of production process, and impromptness of workshop information transmission, it is urgent for enterprises to implement manufacturing execution system to strengthen the ability of production process management and control. Therefore, based on the actual production situation of discrete manufacturing enterprises, this paper constructs the production process control system architecture of this type of enterprises and studies the key architecture. Finally, taking X company as an example, after the implementation of this system, the inventory occupancy rate is reduced by 13%, the average transit time of products in process is shortened by 11 days, the waiting time of the workshop is shortened by 1.4 days, the production statistical table cycle is shortened by 3 days, the quality statistical table and the working time summary table are shortened by 4.5 and 1.5 days respectively.