Research Article
Research on the Conversion of "Cold Standby" State and "Maintenance" State in the "One-Key Sequence Control" Function of the New Generation Centralized Control System Master Station
@INPROCEEDINGS{10.4108/eai.24-11-2023.2343477, author={Xinyi Zhang and Li Mou and Xi Wang and Fengmin Xing and Zhiming Song and Tianhang Li and Xiaoyu He and Haoran Yang}, title={Research on the Conversion of "Cold Standby" State and "Maintenance" State in the "One-Key Sequence Control" Function of the New Generation Centralized Control System Master Station }, proceedings={Proceedings of the International Conference on Industrial Design and Environmental Engineering, IDEE 2023, November 24--26, 2023, Zhengzhou, China}, publisher={EAI}, proceedings_a={IDEE}, year={2024}, month={2}, keywords={centralized control sequential control switching operation}, doi={10.4108/eai.24-11-2023.2343477} }
- Xinyi Zhang
Li Mou
Xi Wang
Fengmin Xing
Zhiming Song
Tianhang Li
Xiaoyu He
Haoran Yang
Year: 2024
Research on the Conversion of "Cold Standby" State and "Maintenance" State in the "One-Key Sequence Control" Function of the New Generation Centralized Control System Master Station
IDEE
EAI
DOI: 10.4108/eai.24-11-2023.2343477
Abstract
This paper provides the state switching method, calling process and system function of electrical equipment based on live display power inspection, analyzes the signal output and verification, system conversion logic, and verifies the feasibility of the operation of switching from cold standby to maintenance without manual power inspection. It is proved that the centralized control system can complete the operation task of equipment from cold standby to maintenance through one-key CIS control. After applied to the field, it can greatly improve the operation efficiency of operation and maintenance personnel, save labor cost and improve safety.
Copyright © 2023–2024 EAI