Research Article
Feasibility Analysis Of The Road Development Plan An Economic Perspective (Overview: Jalan Air Putih-Selat Baru)
@INPROCEEDINGS{10.4108/eai.21-9-2023.2342880, author={Faisal Ananda and Asni Susanti and Sinatu Sadiah Binti Shapie and Hendra Saputra and Nurul Fahmi}, title={Feasibility Analysis Of The Road Development Plan An Economic Perspective (Overview: Jalan Air Putih-Selat Baru)}, proceedings={Proceedings of the 11th International Applied Business and Engineering Conference, ABEC 2023, September 21st, 2023, Bengkalis, Riau, Indonesia}, publisher={EAI}, proceedings_a={ABEC}, year={2024}, month={2}, keywords={project feasibility study investment economic}, doi={10.4108/eai.21-9-2023.2342880} }
- Faisal Ananda
Asni Susanti
Sinatu Sadiah Binti Shapie
Hendra Saputra
Nurul Fahmi
Year: 2024
Feasibility Analysis Of The Road Development Plan An Economic Perspective (Overview: Jalan Air Putih-Selat Baru)
ABEC
EAI
DOI: 10.4108/eai.21-9-2023.2342880
Abstract
It is necessary to prepare a plan for building a new road that can facilitate movement from Bengkalis sub-district to Bantan sub-district, in line with the increase in population and based on the spatial layout of Bengkalis district.. The Public Works and Spatial Planning Office of Bengkalis Regency intends to construct the Air Putih-Selat Baru Road in accordance with this requirement. However, a feasibility study must be conducted before beginning the road building work in order to determine whether the planned road construction is feasible. In this research, the with and without method was used, using two feasibility indicators, namely NPV and BCR. After conducting feasibility analysis, the NPV result obtained is Rp.795.055.896.163 or a positive value and the BCR has a value greater than one, that is 25, so it is considered that the investment is feasible.