Research Article
On site real-time monitoring system based on Internet of things
@INPROCEEDINGS{10.4108/eai.20-12-2021.2315039, author={Zheng Tianyi}, title={On site real-time monitoring system based on Internet of things}, proceedings={Proceedings of the 6th EAI International Conference on IoT in Urban Space, Urb-IoT 2021, 20-21 December 2021, Shenzhen, People’s Republic of China}, publisher={EAI}, proceedings_a={EAI URB-IOT}, year={2022}, month={5}, keywords={water conservancy ai structure}, doi={10.4108/eai.20-12-2021.2315039} }
- Zheng Tianyi
Year: 2022
On site real-time monitoring system based on Internet of things
EAI URB-IOT
EAI
DOI: 10.4108/eai.20-12-2021.2315039
Abstract
The Pearl River Delta water resources allocation project is a water conservancy project with the largest investment, the longest water transmission line and the widest water receiving area in the history of Guangdong Province. It is a strategic project to improve the water security in the Great Bay area of Guangdong, Hong Kong and Macao. It is a water transfer project with the highest water transmission pressure and the longest shield tunnel in the world. It is a long-distance deep tunnel water transmission project in the core area of the Pearl River Delta, It is also an ecological water distribution project in the Pearl River Delta.
Copyright © 2021–2024 EAI