Proceedings of the 3rd International Conference of Education and Science, ICES 2021, November 17-18, 2021, Jakarta, Indonesia

Research Article

The Role of Teachers in The Utilization of Industrial Automation Learning Media Using Portable Boiler Machines in The Engineering Department of SMK Jayabeka 02 Karawang

Download175 downloads
  • @INPROCEEDINGS{10.4108/eai.17-11-2021.2318655,
        author={Mohamad  Jajuli and Rahmat  Hidayat and Adit  Kurniawan and Enjang Ahmad Juanda},
        title={The Role of Teachers in The Utilization of Industrial Automation Learning Media Using Portable Boiler Machines in The Engineering Department of SMK Jayabeka 02 Karawang},
        proceedings={Proceedings of the 3rd International Conference of Education and Science, ICES 2021, November 17-18, 2021, Jakarta, Indonesia},
        publisher={EAI},
        proceedings_a={ICES},
        year={2022},
        month={6},
        keywords={education; teacher; portable boiler},
        doi={10.4108/eai.17-11-2021.2318655}
    }
    
  • Mohamad Jajuli
    Rahmat Hidayat
    Adit Kurniawan
    Enjang Ahmad Juanda
    Year: 2022
    The Role of Teachers in The Utilization of Industrial Automation Learning Media Using Portable Boiler Machines in The Engineering Department of SMK Jayabeka 02 Karawang
    ICES
    EAI
    DOI: 10.4108/eai.17-11-2021.2318655
Mohamad Jajuli1,*, Rahmat Hidayat1, Adit Kurniawan2, Enjang Ahmad Juanda3
  • 1: Universitas Singaperbangsa Karawang
  • 2: Institut Teknologi Bandung
  • 3: Universitas Pendidikan Bandung
*Contact email: mohamad.jajuli@unsika.ac.id

Abstract

The problem for students of the Mechanical Engineering Department of Jayabeka Vocational High School 02 Karawang is they find it difficult to learn the boiler system material. The research uses the method with the following stages: Testing the power supply or regulator; Power Supply Circuit Test; Focus group discussion. From these results, measurements are made three times with no load and with load to ensure that the rated power and rated current on the power supply are in normal and good condition. In testing the power supply circuit, it is done by measuring the output voltage generated at the power supply. Measurements are made three times to ensure that the power supply circuit is in normal and good condition. Based on the results of focus group discussion, the introduction of industrial automation learning media using portable boiler machines can applied and be very helpful for students.