Proceedings of the First Jakarta International Conference on Multidisciplinary Studies Towards Creative Industries, JICOMS 2022, 16 November 2022, Jakarta, Indonesia

Research Article

Cooling and Air Conditioning System Design in Offset Engine Room at Company X to Maintain Performance and Durability of Engine Components

Download309 downloads
  • @INPROCEEDINGS{10.4108/eai.16-11-2022.2326058,
        author={Habibi  Santoso and Widi  Sriyanto and Henra Nanang Sukma},
        title={Cooling and Air Conditioning System Design in Offset Engine Room at Company X to Maintain Performance and Durability of Engine Components},
        proceedings={Proceedings of the First Jakarta International Conference on Multidisciplinary Studies Towards Creative Industries, JICOMS 2022, 16 November 2022, Jakarta, Indonesia},
        publisher={EAI},
        proceedings_a={JICOMS},
        year={2022},
        month={12},
        keywords={cooling system air conditioning design air handling unit engine},
        doi={10.4108/eai.16-11-2022.2326058}
    }
    
  • Habibi Santoso
    Widi Sriyanto
    Henra Nanang Sukma
    Year: 2022
    Cooling and Air Conditioning System Design in Offset Engine Room at Company X to Maintain Performance and Durability of Engine Components
    JICOMS
    EAI
    DOI: 10.4108/eai.16-11-2022.2326058
Habibi Santoso1,*, Widi Sriyanto1, Henra Nanang Sukma1
  • 1: Politeknik Negeri Media Kreatif
*Contact email: habibisantoso1@gmail.com

Abstract

In order to maintain the performance and durability of engine components against damage, several influencing factors are temperature, air cleanliness, and humidity levels in the room. The temperature, air cleanliness and humidity of the room are not within the standard conditions of the machine, resulting in many mechanical and electrical components in the machine being damaged and those problems occurred at Company X. If there is no improvement in the air conditioning in the engine room, the more severe damage to the engine will occur. The engine room area is 104 m2. The design of the cooling and air conditioning system is carried out by several methods, including the calculation of the required capacity, analysis, and design drawings in the engine area. Based on the calculation, the required cooling capacity unit in the engine room is 9.36 Kw with 1640 l/s. This capacity already includes the need for Fresh Air which is needed at 245 l/s. With this capacity, the temperature and air quality suitable for the engine can be achieved.