Economic Analysis of Investment Feasibility in the Planning of the Construction of 50 MW Solar Power Plant (PLTS) in Capital of Indonesia, Kalimantan

Download277 downloads
  • @INPROCEEDINGS{10.4108/eai.12-11-2022.2327319,
        author={Jalius  Salebbay and Meirinaldi  Meirinaldi},
        title={Economic Analysis of Investment Feasibility in the Planning          of the Construction of  50 MW Solar Power Plant (PLTS)               in Capital of Indonesia, Kalimantan},
        proceedings={Proceedings of the 2nd Multidisciplinary International Conference, MIC 2022, 12 November 2022, Semarang, Central Java, Indonesia},
        publisher={EAI},
        proceedings_a={MIC},
        year={2023},
        month={2},
        keywords={energy econom; solar panels; investment},
        doi={10.4108/eai.12-11-2022.2327319}
    }
    
  • Jalius Salebbay
    Meirinaldi Meirinaldi
    Year: 2023
    Economic Analysis of Investment Feasibility in the Planning of the Construction of 50 MW Solar Power Plant (PLTS) in Capital of Indonesia, Kalimantan
    MIC
    EAI
    DOI: 10.4108/eai.12-11-2022.2327319
Jalius Salebbay1,*, Meirinaldi Meirinaldi1
  • 1: Universitas Borobudur, Indonesia
*Contact email: salebbay@gmail.com

Abstract

The scenario in electrifying the Capital of the Archipelago (IKN) Indonesia will carry the concept of Green, Smart and Beautiful. In its application, energy that will be utilized through new and renewable energy (EBT) based power generation sources without emissions, one of which is the use of 50 MW Solar Power Plants. This study aims to analyze investment feasibility and calculate the reduction emissions resulting from the installation of this system. Research methods carried out through simulations and literature studies, simulations using homer applications and library studies sourced from IKN, PLN, ESDM documents. The simulation uses 8000 solar panels. From the simulation results, it produces panel production of 5,140,8520 kwh / year, with a capacity of 385 wp / panel. An investment of Rp. 41,179,167652 means a cost saving of Rp. 5,320,438,200/year at a price of Rp. 1,035/kwh. Pay back period for 8 years with an NPV value of 1.45, BCR of 1.20, NPV value of 0.89 or > 0 and IRR=0 means that investment in terms of economic calculations is feasible. Carbon reduction yield of 421 tons of CO2 / year.