Proceedings of the 2nd International Conference on Public Management, Digital Economy and Internet Technology, ICPDI 2023, September 1–3, 2023, Chongqing, China

Research Article

Research on the Analysis of Influence Factors of Power Grid Engineering Cost Based on Cluster Analysis-Interpretation Structure Model

Download100 downloads
  • @INPROCEEDINGS{10.4108/eai.1-9-2023.2338838,
        author={Biao  Chen and Hongyi  Chen and Cong  Zeng and Ying  Wang and Ye  Ke},
        title={Research on the Analysis of Influence Factors of Power Grid Engineering Cost Based on Cluster Analysis-Interpretation Structure Model},
        proceedings={Proceedings of the 2nd International Conference on Public Management, Digital Economy and Internet Technology, ICPDI 2023, September 1--3, 2023, Chongqing, China},
        publisher={EAI},
        proceedings_a={ICPDI},
        year={2023},
        month={11},
        keywords={power grid engineering cost factor analysis cluster analysis explanatory structural model},
        doi={10.4108/eai.1-9-2023.2338838}
    }
    
  • Biao Chen
    Hongyi Chen
    Cong Zeng
    Ying Wang
    Ye Ke
    Year: 2023
    Research on the Analysis of Influence Factors of Power Grid Engineering Cost Based on Cluster Analysis-Interpretation Structure Model
    ICPDI
    EAI
    DOI: 10.4108/eai.1-9-2023.2338838
Biao Chen1,*, Hongyi Chen1, Cong Zeng1, Ying Wang1, Ye Ke1
  • 1: State Grid Fujian Economic Research Institute
*Contact email: chenb202309@163.com

Abstract

With the continuous expansion of the investment scale of the power grid project, strengthening the project cost management is one of the important means to improve the investment efficiency and efficiency of enterprises. However, the current research on the influence of market factors for the cost is mainly focused on taking passive control means to eliminate or use the change of market factors, however, for the background of the national unified market factors change of power grid engineering construction cost disturbance mechanism is not clear, need further study national unified market factors of the evolution of the developing market characteristics and monitoring methods, and clear the market factors change of power transmission and transformation project cost, conduction and evolution.