Modelling Uncertainty Factors in Environmental Issues on Late Delivery for Construction Industry: A Propose

Download
376 downloads
  • @INPROCEEDINGS{10.1007/978-3-642-32573-1_29,
        author={Zirawani Baharum and Noorfa HaszlinnaMustaffa and Mohd Ngadiman and Azliza Yacob},
        title={Modelling Uncertainty Factors in Environmental Issues on Late Delivery for Construction Industry: A Propose},
        proceedings={Signal Processing and Information Technology. First International Joint Conference, SPIT 2011 and IPC 2011, Amsterdam, The Netherlands, December 1-2, 2011, Revised Selected Papers},
        proceedings_a={SPIT \& IPC},
        year={2012},
        month={10},
        keywords={Modelling Uncertainty Environment Issues Construction Industry},
        doi={10.1007/978-3-642-32573-1_29}
    }
    
  • Zirawani Baharum
    Noorfa HaszlinnaMustaffa
    Mohd Ngadiman
    Azliza Yacob
    Year: 2012
    Modelling Uncertainty Factors in Environmental Issues on Late Delivery for Construction Industry: A Propose
    SPIT & IPC
    Springer
    DOI: 10.1007/978-3-642-32573-1_29
Zirawani Baharum1,*, Noorfa HaszlinnaMustaffa1,*, Mohd Ngadiman1,*, Azliza Yacob2,*
  • 1: University Technology Malaysia
  • 2: TATI University College
*Contact email: zirawani@gmail.com, noorfa@utm.my, salihin@utm.my, azliza@tatiuc.edu.my

Abstract

A very limited research of fixing uncertainties in environmental issues (EI) actually encountered biggest problems for company, especially in late delivery (LD) of project completion for construction industry (CI). Uncertainty could be happens causes by many factors which known or unknown, statically to totally ignorance. Many factors of uncertainties have been modelled in previous research by ignored factors in EI. However, in the real cases all the factors must be manage even it is in-deterministic. Therefore, the modelling of uncertainty factors in EI for CI is very important to be studied, and it will be considered to be used as guidance for decision makers while they are facing with the problems that related to uncertainties. The uncertainty of EI can split into 2 categories; acts of God and acts of humans.. Preliminary result of conceptual model for uncertainty factors in EI is presented according to previous case study.