Research Article
INTEGRAL: ICT-Platform Based Distributed Control in Electricity Grids with a Large Share of Distributed Energy Resources and Renewable Energy Sources
554 downloads
@INPROCEEDINGS{10.1007/978-3-642-19322-4_23, author={Gerard Peppink and Ren\^{e} Kamphuis and Koen Kok and Aris Dimeas and Evangelos Karfopoulos and Nikos Hatziargyriou and Nour\^{e}dine Hadjsaid and Raphael Caire and Rune Gustavsson and Josep Salas and Hugo Niesing and J\o{}rgen Velde and Llani Tena and Frits Bliek and Marcel Eijgelaar and Luc Hamilton and Hans Akkermans}, title={INTEGRAL: ICT-Platform Based Distributed Control in Electricity Grids with a Large Share of Distributed Energy Resources and Renewable Energy Sources}, proceedings={Energy-Efficient Computing and Networking. First International Conference, E-Energy 2010, Athens, Greece, October 14-15, 2010, Revised Selected Papers}, proceedings_a={E-ENERGY}, year={2012}, month={10}, keywords={Smart Grids DER/RES integration Distributed Control ICT multi-agent systems}, doi={10.1007/978-3-642-19322-4_23} }
- Gerard Peppink
René Kamphuis
Koen Kok
Aris Dimeas
Evangelos Karfopoulos
Nikos Hatziargyriou
Nourédine Hadjsaid
Raphael Caire
Rune Gustavsson
Josep Salas
Hugo Niesing
Jörgen Velde
Llani Tena
Frits Bliek
Marcel Eijgelaar
Luc Hamilton
Hans Akkermans
Year: 2012
INTEGRAL: ICT-Platform Based Distributed Control in Electricity Grids with a Large Share of Distributed Energy Resources and Renewable Energy Sources
E-ENERGY
Springer
DOI: 10.1007/978-3-642-19322-4_23
Abstract
The European project INTEGRAL aims to build and demonstrate an industry-quality reference solution for DER aggregation-level control and coordination, based on commonly available ICT components, standards, and platforms. To achieve this, the is introduced. The project includes also three field test site installations in the Netherlands, Spain and France, covering normal, critical and emergency grid conditions.
Copyright © 2010–2024 ICST