Adaptive Adjustment Method for Construction Progress of Fabricated Buildings Based on Internet of Things
@INPROCEEDINGS{10.1007/978-3-030-67871-5_44, author={Qian He and Qian-sha Li}, title={Adaptive Adjustment Method for Construction Progress of Fabricated Buildings Based on Internet of Things}, proceedings={Advanced Hybrid Information Processing. 4th EAI International Conference, ADHIP 2020, Binzhou, China, September 26-27, 2020, Proceedings, Part I}, proceedings_a={ADHIP}, year={2021}, month={2}, keywords={Internet of Things Prefabricated building Construction progress Self-adaption Method of adjustment}, doi={10.1007/978-3-030-67871-5_44} }
- Qian He
Qian-sha Li
Year: 2021
Adaptive Adjustment Method for Construction Progress of Fabricated Buildings Based on Internet of Things
ADHIP
Springer
DOI: 10.1007/978-3-030-67871-5_44
Abstract
Traditional assembly-type construction progress projects have shortcomings such as long construction period, poor environmental benefits and high building energy consumption. In view of these problems, this paper proposes an adaptive adjustment method of prefabricated building construction schedule based on Internet of things. Utilize the advantages of the Internet of Things, collect information on the construction progress, and then effectively scan and bind according to the construction progress information. Then build the progress management data information model of the prefabricated building project, calculate the minimum value of the maintenance cost load in the construction progress, and realize the adaptive adjustment target of the project schedule. The results show that the adaptive adjustment method of the construction progress of the fabricated building based on the Internet of Things is superior to the traditional method in engineering error rate and construction safety, which greatly reduces the construction period and is more effective in use.